Case studies
Real projects, from your drawing to shipped parts
Each case study follows one real project through our records: what the customer sent, what we checked in the DFM report, what changed after the first shots and what was delivered. Every figure comes from the project’s quotation, DFM report, invoices and correspondence. Customer names and part numbers are removed.
Italy · Electronics. Single-cavity ABS mould: DFM in 3 days, one design change after the first shots, T1 approved and 1,000 parts packed on day 93.
Germany · Electrical. 1+1 family die-casting die in ADC12: DFM on the day of the deposit, T2 approved on day 90, repeat orders from the same die up to 2025.